Wednesday 5 November 2014

32 - Work in Progress

 I haven't been posting for a week or two but I still managed to get some work done. 
 I ordered a silencer box from Spain but as I suspected it did not fit all that well. The problem is the bracket, it's holding the box in a bad position so that it's hitting against the frame at the tail pipe. I think the best thing I could do is cut it off and make a new one that holds everything in the right position.  Note how far off it is in the bottom picture, plus the silencer also needs to move in towards the engine to make a bit of clearance against the frame.











  Stevie, a workmate, came over one day to ask how I was getting on with the exhaust pipe and offered to let me try his set of 'blow out' plates. I did try them but with not a lot of success. The problem was getting enough pressure inside the pipe to blow the dent out. At around 30 psi the air would escape because I just could not get the plates to clamp onto the pipe tight enough. So unfortunately I had to go back to my idea of building them up with brazing rod.

 In our conversation Stevie mentioned he was getting some bits zinc plated for a 250 Maico he's restoring, and did I need anything done? Well I hadn't thought about it, but I looked out some parts that evening and was really pleased at the result, especially the spring. Thanks Stevie.



 Included in that little batch was six original bolts from the wheel, they look good and I'm in the notion of sourcing a few more for the more prominent locations around the bike. Also I got a couple of new Akront decals for the rim too.






 So I'm almost finished with the frame, I had to make a little cable ring for the speedo and petty much all that's left to do now is it rub it down and get it ready for Clifford to paint. Hopefully I'll get it to him within the next fortnight.







No comments:

Post a Comment